Controlling flood risk on Devon’s New Link Road
Controlling surface water flooding was a vital consideration in planning and building Mid Devon’s new £8.42 million A3072 Crediton Link Road. By using Hydro-Brake Optimum vortex flow controls as part of a SuDS approach, South West Highways (SWH) & Devon…
Read more
Share this article