GEZE UK responded to the call “to be the best” as part of a three-year, multi-million pound make-over, of the National Army Museum, in London – making it more accessible and providing enhanced visitor facilities.
The reconfiguration of its 1970 and 80’s interior has transformed the museum and it is hoped that the £23.75 million re-development will open doors to new audiences enabled by GEZE products fitted around the building.
Included in the re-fit were five pairs of TSA 160 NT automatic swing door operators. These were fitted to the corridors and entrances to the museum’s board room and Play Base – for children up to 8 years old.
There are also 10 TS 550 E floor springs and 60 Boxer integrated door closers fitted to manual doors throughout the building – from study areas and corridors to behind-the-scenes facilities