An exhaustive four-month project to replace existing fire compartmentation walls within the labyrinthine roof-spaces to a Nottinghamshire community hospital has been successfully carried out by a Midlands based contractor, highly experienced in the installation of the FIREFLY® systems used.
In total, the work carried out in the third quarter of last year saw its six-man team install some 650 m2 of vertical barrier and a further 490m2 of horizontal protection atop these new walls.
The carefully designed installations, including a variety of project specific details, made use of Zeus Lite 90:30 and Zeus Horizontal 60:30 FIREFLY® barriers, together with FB180 batts mechanically fixed to the soffit: forming a ‘protected zone’ extending to 1500mm either side of the wall.