Solihull’s Council offices have been transformed with a major refurbishment of its mid-century office block. The upgrade required alterations and extension works to provide new open-plan space, an atrium and facades. Replacement of the existing windows for new units with high thermal and acoustic performance whilst maintaining the character of the buildings was essential.
Kestrel 60mm window system was chosen because of its proven track record in this type of development.
The windows are full height with low U-value double glazing throughout, all with high-level PAS24 security accreditation. Units were powder coated to provide a long-lasting, and colour-durable quality finish. Kestrel worked with Tamworth’s WD Group to ensure the successful delivery of the project.